Weekly progress:

  • Foundation for ADA ramp has been excavated and prepared for pouring concrete.
  • Door openings have been cleaned out, measured, and prepared for mortar patching.
  • Interior ramps have been measured and excavated.
  • Drawings for ceiling have been further developed.

Comment