• Exterior ADA ramp anchored, leveled, and platforms are secured.  
  • Formwork created for interior ramps at side wings 
  • Concrete poured for interior ramps 
  • Steel is being cut and measured for the bench frames
  • Shop drawings and ceiling system finalized

 

Comment